No Drilling Required BT482P-CHR Guia de Instalação

Consulte online ou descarregue Guia de Instalação para não No Drilling Required BT482P-CHR. No Drilling Required BT482P-CHR Installation Guide Manual do Utilizador

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
  • Página
    / 1
  • Índice
  • MARCADORES
  • Avaliado. / 5. Com base em avaliações de clientes
Vista de página 0
Shower Bar Installation
Step 1: Remove chrome cover cap from
each of the two chrome posts and carefully
loosen dual set screws
Step 2: Slide the adjustable holder onto
middle of the bar by squeezing the button.
Slide ends pieces onto bar and lightly
tighten dual set screws
Step 3: Position in shower to optimum
height and adjust chrome post to desired
position. Tighten dual set screws until firm
(do not over tighten)
Step 4: Clean surface with alcohol pad and
let dry completely. Attach adapter to each
end post and peel and set in position.
Unscrew adapter and remove bar.
Step 5: Pierce adhesive tube with red key
and inject into one hole until it beads up
the opposite check hole. Let stand
undisturbed for 12 hours.
Step 6: Assemble bar to adapter and attach
the hand shower
Vista de página 0
1

Resumo do Conteúdo

Página 1 - Shower Bar Installation

Shower Bar InstallationStep 1: Remove chrome cover cap from each of the two chrome posts and carefully loosen dual set screws Step 2: Slide the adjust

Comentários a estes Manuais

Sem comentários